第二个A & A Project: 给咖啡厅加盖户外硬顶凉棚和内部装修

(2014-10-06 00:02:10) 下一个

Erection of  a Hard Roof  for Outdoor Refreshment Area (ORA) and Interior Decoration for Coffee Shop


1. In the Beginning

A. 
2. Preliminary Works 

a. To engage Professional Engineer (PE) to submit and endorse drawings to the followings for Outdoor Refreshment Area (ORA):

1. Building Control Authority (BCA) 

2. Fire Safety Shelter Department (FSSD)

3. Housing Development Board (HDB)

4. National Environment Agency (NEA) 

b. To design,calculate and endorse on Re-enforced Concrete (RC) stumps/footings to hold Newly Proposed Metal Roof

c. To design,calculate and endorse on Main Structural framing elements of Roof

d. To purchase plans from Relevant Plans from BCA and FSSD for submission purpose

3. Demonlition Works 

3.1 To dismantle Existing Canopy and Footings

3.2 To hack off Existing Poles and Lights

3.3 To excavate and cave out roots for New RC Footings

3.4 To remove Existing Gutter and rainwater downpipes (RWDPs)

4. Masonry Works 

4.1 To cast RC Footings (RC Stumps) to receive new timber support 

4.2 To supply waterproofing membrane

4.3 To make good peripheral of RC Footings with Heavy Duty Ceramic Tiles

4.4 To erect Metal Posts to support Metal roofing (8)

5. Roofing Works 

5.1 To erect Main Framing to support roof using 6-8mm thick Galvanized MS hollow sections 

5.2 To erect Proposed New Roof using Kalzip profiled Metal roofing with C-Channels and Purlins, Angle Plates, BRC Meshes and Insulations 

5.3 To cast New gutter and Aluminum Flashing with RWDPs 

6. False Ceiling Works 

6.1 To erect false ceiling panel using Calcium Silicate Boards 
6.2 To paint the ceiling

7. Electrical Works 

7.1To  install electricity wiring and board 
7.2 To install Fans and lights
7.3 To install sign boards for all stalls and whole coffee shop

8. Miscellaneous Works

8.1To clear debris after works

8.2To erect hoarding Works

8.3 To install kitchen tables and gas stoves and ventilation system
8.4 To make deposit to management

  9. Grand Total (after discount) = $58,000 for ORA and $100,000 for interior/exterior decoration and kitchen appliances

10. Completion and in OperationT09LL2004G

 